76 Commits (081ecb325069a62bc4d2d2a7c90571ef11a0bd24)
 

Author SHA1 Message Date
dev 081ecb3250 Stages 6b and 7b of Dart done and integrated: the library is complete
1 day ago
dev df0b777155 Handoff for 7 October: stages 0 to 5 of Dart, 6a and 7a done; 6b and 7b next
2 days ago
dev 75e5a9be57 The remotes of datekeys-dart and docs, created on 6 October
2 days ago
dev 32ce5c0848 Stages 6 and 7 of Dart: 6a and 7a running in parallel, 6b and 7b next
2 days ago
dev d74a145124 Stage 5 of Dart complete: 5c reviewed; the handoff brought up to date
2 days ago
dev f9ff8568c4 Add mobile encrypted vault and duress PIN idea
2 days ago
dev 5d5982557e Stage 5 of Dart: 5a reviewed and integrated over 5b, 5c running
2 days ago
dev 20249cf2af Stage 5b of Dart reviewed: testdata at v0.12, commitments, alg 1, verdicts
2 days ago
dev 6f90ea416d Stage 4 of Dart complete; stage 5 split into 5a, 5b and 5c, running
2 days ago
dev 6d48ff8208 The generator commit of datekeys-go is pushed
2 days ago
dev 913bd4c1dc Stage 4 of Dart: parts 4a and 4b reviewed and integrated, 4c running
2 days ago
dev 08858e50ab Stage 4 of Dart: the tables for Dart, and its three parts
2 days ago
dev d19bd897f8 Stage 3 of Dart reviewed and integrated on v0.11; next is stage 4
2 days ago
dev 0ecba84ddb Stage 2 of Dart done and reviewed; stage 3 running in its own worktree
2 days ago
dev a60da38954 Handoff for the next session: where every repo is, and stage 2 of Dart to relaunch
2 days ago
dev affdd8d01a Handoff: the decisions of 5 October, and the approval of v0.12 left for later
2 days ago
dev 098b6feffe Handoff: TypeScript at the draft v0.12, pushed, and stages 0 and 1 of Dart
2 days ago
dev 65b5a6c357 Handoff: the close of the session of 5 October
2 days ago
dev 0c2f97eb1a Handoff: the close of the session of 2 October
6 days ago
dev ac47bf6477 Dart plan v2 and the signature plan: what the review found
6 days ago
dev d60b856207 Review of the session of 1 and 2 October, done on Sonnet by mistake
6 days ago
dev c2bdfa4531 Handoff: the close of the session of 1 and 2 October
6 days ago
dev 13d7694abc Plan for the Dart library: scope by stages and the decision on dependencies
6 days ago
dev 1d737cf6bf Handoff: spec v0.11 approved and tagged, and the next steps
6 days ago
dev 4a144a9dcd Handoff: the signature plan done in Go, the review, and what is left
6 days ago
dev 07d777f2df Product idea: a conditional release switch with Sapphire, apart from the capsule
6 days ago
dev a7c510405f Handoff at the end of the session of 1 October: spec v0.11 draft and steps 1 to 4 of the signature
6 days ago
dev e5d83fb2ef Signature plan: the envelope can hide inside another file
6 days ago
dev 032aa99a30 Signature plan and handoff: no list of authorities
6 days ago
dev ac5e21def1 Signature plan and handoff: the key of words v2 is done in Go and in the page
6 days ago
dev b346bfc938 Signature plan and handoff: the author's four decisions are in the draft
6 days ago
dev 3846fd62b3 Adversarial review of the spec v0.11 draft: three reports and what is pending
6 days ago
dev 349d5a35ef Signature plan and handoff: the spec v0.11 draft is written
6 days ago
dev d5735875b4 Fable and Astra's proposal on signatures and seals, and what the spec says about it
6 days ago
dev 758e39595d Spec v0.11 plan: upload the capsule before writing the .dkk that points to it
6 days ago
dev b008e677de Spec v0.11 plan: the .dkk says where the .dkc is, encrypted for the date
6 days ago
dev 870b6403c6 Spec v0.11 plan: a public note in the capsule and in the .dkk; content outside the capsule proposed
6 days ago
dev 2e3cecde08 Handoff for 2 October: format 3 in the page, the key of words, the signature area review
7 days ago
dev 60f85b126d Review request: the size of the signature and seal area, for Fable and Astra
7 days ago
dev 72081faac4 Signature plan: the mobile, desktop, CLI and web applications
7 days ago
dev 6e6cc8f06a Signature plan: external CAdES signatures with certificates, a larger area, RFC 3161
7 days ago
dev 82fab27cbe Plan of the author signature in Go (spec v0.11)
7 days ago
dev 110b131f98 Word key: what the page does
7 days ago
dev e5f68636e0 Word key: the portable key as a .dkk file or as six words
7 days ago
dev bf2187c690 Plan of format 3 in datekeys-ts: step 8 done
7 days ago
dev 0340f0f1c6 Plan of format 3 in datekeys-ts: step 7 done
7 days ago
dev 83fd9e1e2e Plan of format 3 in datekeys-ts: step 6 done
7 days ago
dev 7c5781fca5 Plan of format 3 in datekeys-ts: step 5 done
1 week ago
dev d08ffc0fd2 Plan of format 3 in datekeys-ts: step 4 done
1 week ago
dev ce2f6b6bff Plan of format 3 in datekeys-ts: steps 2 and 3 done
1 week ago

Powered by TurnKey Linux.