Commit Graph

18 Commits (b9339633f0f149bd8972076e548f6924a1e9262c)

Author SHA1 Message Date
dev 4c1fbec1d8 docs(audit): formal programme close-out + the clean-room continuation handoff
3 months ago
dev 3fc450fccc docs(process): handoff - AUDIT PROGRAMME COMPLETE, full matrix green (134/0/0); next = clean-room P1s
3 months ago
dev 5f55c5dcc1 docs(process): handoff - R-1.x census closed (129 PASS); queue = final lote 6 only, then clean-room P1s
3 months ago
dev 850fd1e725 docs(process): handoff - runtime-discipline tail closed, contracts 37/37; queue = R-1.x census + lote 6
3 months ago
dev 82e9aba946 docs(process): handoff - demos out of the fix (new system demo frame); real queue = 16 in 3 families
3 months ago
dev 5fa5271586 docs(process): handoff - contracts census closed (12->3); deliberate tail = float-panel/media-player runtime discipline
3 months ago
dev cbd86c35a6 docs(process): handoff - S9 COMPLETE (all three initiatives closed); remaining = cross-catalog censuses only
3 months ago
dev fea4c14b09 docs(process): handoff - S9 ntp integral closed; remaining = metrics+suite + three cross-catalog censuses
3 months ago
dev f59f51a824 docs(process): handoff - S9 gradient-* closed; next ntp integral / metrics+suite + two cross-catalog censuses
3 months ago
dev bf573430b8 docs(theming): close the touch-rows/§37 reconciliation — pseudo hit-slop CONFIRMED (user decision)
3 months ago
dev 20e2e7a1f0 docs(components): S4 lotes 2-5 + drag-drop — 24 consumer-door dossiers, E-2.3 = 0 (P7)
3 months ago
dev 270cc3d764 docs(process): handoff - S4 lote 1 hash + turnkey start block for lote 2 (pickers/nav)
3 months ago
dev 7b82aa79f6 docs(components): S4 lote 1 (forms) — consumer-door dossiers + field-langs soma contract (P7)
3 months ago
dev cccdb89785 docs(process): handoff — P7 baseline+S7 done; S4 dossier plan (5 batches), S9 deferred post-S4
3 months ago
dev c0ae3de102 fix(soma): clear the two mandated baseline type errors (P7 — editable, grid-list)
3 months ago
dev 05a62a3861 docs(process): handoff — P6 closed (C6 weekInfo, C7 D13 census, B.11 splitter pair); next P7
3 months ago
dev 3c36c051c9 docs(process): refresh audit-fix handoff — S6 Field-family complete
3 months ago
dev 53b6f629f2 feat(audit): component re-audit + fixes P0–P5 (P4 complete, P5 in progress)
3 months ago

Powered by TurnKey Linux.