Commit Graph

140 Commits (58076cadfe4986e98446ef8dfdd99be8739936c0)

Author SHA1 Message Date
dev 58076cadfe eidos(surface): primitiva Surface - el lienzo temable (Box + tratamiento), v2.1
3 months ago
dev 63f6209e5f eidos(gradient-finish): v1.5 kind spread - rotacion de matiz anclada, medida antes de implementar
3 months ago
dev a63d806b66 eidos(gradient-finish): override del dial por tema/modo - v1.x COMPLETA + capitulo del libro
3 months ago
dev 322a1939a8 eidos(gradient-finish): acabado anclado a la sombra de la tinta - v1 Button+Badge + dial temable + guard
3 months ago
dev 90b66ea138 docs(proof-of-human): "Adding a new challenge" recipe in the orchestrator README
3 months ago
dev 8b06f6bc70 docs(proof-of-human): close out the component - READMEs + challenge-aware demo
3 months ago
dev cdb3db7095 feat(proof-of-human): Clock - cuckoo skin over the RotateAlign engine
3 months ago
dev 724ab51ed8 docs(proof-of-human): rewrite handoff — RotateAlign shipped, clock skin is next
3 months ago
dev 139cc2b671 docs(proof-of-human): mark end-to-end verification + pointer test done
3 months ago
dev e1b5dec844 docs(proof-of-human): mark component:audit done in continuation
3 months ago
dev 1f7018b910 feat(proof-of-human): re-architect to orchestrator + pluggable challenge (PathTrace)
3 months ago
dev e0d82a9044 docs(theming): close F4-D queue — anti-CLS shipped, container-query dogfood declined
3 months ago
dev d8b984bb5a test(motion): pin firma-vs-stagger cascade precedence (F4-D motion decision)
3 months ago
dev a52f80ceab refactor(eidos): prune the depth `scrim` cue (F4-D scrim decision)
3 months ago
dev 6c55e092b5 docs(theming): F4-D adjudications — register deliberate limits + KEEP verdicts
3 months ago
dev 7d4f95005d feat(eidos): default fonts -> variable woff2 + full variable-font API
3 months ago
dev 58c798b195 feat(eidos): F4-D foundation — themed selection, caret, scrollbars
3 months ago
dev 1c7b4e7f51 docs(process): continuation handoff — session close state (THM-2 + THM-4 done)
3 months ago
dev 34d1d46bdb docs(theming): close THM-4 — 5 hotspots adjudicated, only 1 real debt item
3 months ago
dev 75fa94005b refactor(stepper): THM-4 — consolidate step state on data-state, drop boolean aliases
3 months ago
dev d9c3d03f7d docs(theming): THM-4 dossier — media-player + stepper adjudicated, low debt rate
3 months ago
dev 0a5aa387b9 docs(theming): close THM-2 rollout — Avatar.Badge out of the scale palette by design
3 months ago
dev cc7e9a162a feat(theming): THM-2 - avatar root palette to the shared layer + 33 scales
3 months ago
dev 05f0031cad feat(theming+soma): media-player Batch-4 (SOM-4) + THM-2 shared-palette rollout to 14 surfaces
3 months ago
dev c00164570a feat(text-gradient): `colors` discriminates canonical name vs stop list (folds `preset`)
3 months ago
dev 6da8466f68 docs(process): handoff — media-player Batch-4 scopeado como arranque de la próxima sesión
3 months ago
dev 0e75890f60 feat(theming): THM-2 — paleta universal por instancia (capa compartida + forward), 5/17 superficies
3 months ago
dev 63b371d5ce feat(packs+text): incorporate the animation collection — Ambient pack + text-effects family + docs
3 months ago
dev 082b66232a docs(process): SEM-4 COMPLETO — D.6 ya estaba vivo (registro reconciliado) + D.2 descartado
3 months ago
dev b55ca6eecb fix(cleanroom): F2+F3+F4-C+SEM-4s1 — lote mecánico, censos con guard, corpus documental y el close polimórfico de los pickers VIVO
3 months ago
dev 29e621b17c docs(process): handoff — F0+F1 EJECUTADAS; turnkey F2 (lote mecánico) + doctrina AUX-1
3 months ago
dev 4addfd7dbf fix(cleanroom): P1s ejecutados (EID-1/EID-2/SEM-1/MOR-4/THM-1/THM-3) + auditoría + plan scene/ambient
3 months ago
dev 4c1fbec1d8 docs(audit): formal programme close-out + the clean-room continuation handoff
3 months ago
dev 3fc450fccc docs(process): handoff - AUDIT PROGRAMME COMPLETE, full matrix green (134/0/0); next = clean-room P1s
3 months ago
dev 5f55c5dcc1 docs(process): handoff - R-1.x census closed (129 PASS); queue = final lote 6 only, then clean-room P1s
3 months ago
dev 850fd1e725 docs(process): handoff - runtime-discipline tail closed, contracts 37/37; queue = R-1.x census + lote 6
3 months ago
dev 82e9aba946 docs(process): handoff - demos out of the fix (new system demo frame); real queue = 16 in 3 families
3 months ago
dev 5fa5271586 docs(process): handoff - contracts census closed (12->3); deliberate tail = float-panel/media-player runtime discipline
3 months ago
dev cbd86c35a6 docs(process): handoff - S9 COMPLETE (all three initiatives closed); remaining = cross-catalog censuses only
3 months ago
dev fea4c14b09 docs(process): handoff - S9 ntp integral closed; remaining = metrics+suite + three cross-catalog censuses
3 months ago
dev f59f51a824 docs(process): handoff - S9 gradient-* closed; next ntp integral / metrics+suite + two cross-catalog censuses
3 months ago
dev bf573430b8 docs(theming): close the touch-rows/§37 reconciliation — pseudo hit-slop CONFIRMED (user decision)
3 months ago
dev 20e2e7a1f0 docs(components): S4 lotes 2-5 + drag-drop — 24 consumer-door dossiers, E-2.3 = 0 (P7)
3 months ago
dev 270cc3d764 docs(process): handoff - S4 lote 1 hash + turnkey start block for lote 2 (pickers/nav)
3 months ago
dev 7b82aa79f6 docs(components): S4 lote 1 (forms) — consumer-door dossiers + field-langs soma contract (P7)
3 months ago
dev cccdb89785 docs(process): handoff — P7 baseline+S7 done; S4 dossier plan (5 batches), S9 deferred post-S4
3 months ago
dev c0ae3de102 fix(soma): clear the two mandated baseline type errors (P7 — editable, grid-list)
3 months ago
dev 05a62a3861 docs(process): handoff — P6 closed (C6 weekInfo, C7 D13 census, B.11 splitter pair); next P7
3 months ago
dev 3c36c051c9 docs(process): refresh audit-fix handoff — S6 Field-family complete
3 months ago
dev 53b6f629f2 feat(audit): component re-audit + fixes P0–P5 (P4 complete, P5 in progress)
3 months ago

Powered by TurnKey Linux.