Commit Graph

81 Commits (4addfd7dbfa2669bccb1b02f624e267b908f0b2d)

Author SHA1 Message Date
dev 4addfd7dbf fix(cleanroom): P1s ejecutados (EID-1/EID-2/SEM-1/MOR-4/THM-1/THM-3) + auditoría + plan scene/ambient
3 months ago
dev 4c1fbec1d8 docs(audit): formal programme close-out + the clean-room continuation handoff
3 months ago
dev 3fc450fccc docs(process): handoff - AUDIT PROGRAMME COMPLETE, full matrix green (134/0/0); next = clean-room P1s
3 months ago
dev 5f55c5dcc1 docs(process): handoff - R-1.x census closed (129 PASS); queue = final lote 6 only, then clean-room P1s
3 months ago
dev 850fd1e725 docs(process): handoff - runtime-discipline tail closed, contracts 37/37; queue = R-1.x census + lote 6
3 months ago
dev 82e9aba946 docs(process): handoff - demos out of the fix (new system demo frame); real queue = 16 in 3 families
3 months ago
dev 5fa5271586 docs(process): handoff - contracts census closed (12->3); deliberate tail = float-panel/media-player runtime discipline
3 months ago
dev cbd86c35a6 docs(process): handoff - S9 COMPLETE (all three initiatives closed); remaining = cross-catalog censuses only
3 months ago
dev fea4c14b09 docs(process): handoff - S9 ntp integral closed; remaining = metrics+suite + three cross-catalog censuses
3 months ago
dev f59f51a824 docs(process): handoff - S9 gradient-* closed; next ntp integral / metrics+suite + two cross-catalog censuses
3 months ago
dev bf573430b8 docs(theming): close the touch-rows/§37 reconciliation — pseudo hit-slop CONFIRMED (user decision)
3 months ago
dev 20e2e7a1f0 docs(components): S4 lotes 2-5 + drag-drop — 24 consumer-door dossiers, E-2.3 = 0 (P7)
3 months ago
dev 270cc3d764 docs(process): handoff - S4 lote 1 hash + turnkey start block for lote 2 (pickers/nav)
3 months ago
dev 7b82aa79f6 docs(components): S4 lote 1 (forms) — consumer-door dossiers + field-langs soma contract (P7)
3 months ago
dev cccdb89785 docs(process): handoff — P7 baseline+S7 done; S4 dossier plan (5 batches), S9 deferred post-S4
3 months ago
dev c0ae3de102 fix(soma): clear the two mandated baseline type errors (P7 — editable, grid-list)
3 months ago
dev 05a62a3861 docs(process): handoff — P6 closed (C6 weekInfo, C7 D13 census, B.11 splitter pair); next P7
3 months ago
dev 3c36c051c9 docs(process): refresh audit-fix handoff — S6 Field-family complete
3 months ago
dev 53b6f629f2 feat(audit): component re-audit + fixes P0–P5 (P4 complete, P5 in progress)
3 months ago
dev 40284a3d98 docs(process): arts-docs-reconciliation COMPLETE — A0..B3 closed
3 months ago
dev e8ae85ee94 docs(arts): B1 — promote active-app to an architecture chapter
3 months ago
dev 275689874e docs(process): arts-docs-reconciliation continuation handoff
3 months ago
dev 528de2b271 docs(process): lock the arts-reconciliation structural decisions
3 months ago
dev 6941f1bf09 docs(process): mark Knob relocation + Gesture.rotate wiring done
3 months ago
dev daca836026 docs(process): arts docs reconciliation plan (the active-app ecosystem)
3 months ago
dev d4f9474f06 docs(process): mark STUMBLES S4 (Gesture.rotate) done; next = Knob wiring + S5/S6
3 months ago
dev b98e9fbfeb docs(process): mark STUMBLES S2 (continuous-components doctrine) done; next = S4
3 months ago
dev 5508dfb4ee refactor(adom): own port of runed's DOM-reactive runes (F3) — port complete
3 months ago
dev 02d87b37f3 docs(process): mark STUMBLES S3 (part-absent) done; next = S2/S4
3 months ago
dev d0f41fb21a refactor(libs): own port of runed + tabbable — drop 2 runtime deps (F1+F2)
3 months ago
dev 7f657ce6be docs(process): hand-off — continue-with-stumbles-s2-s6 (verified S2/S3/S4 plans)
3 months ago
dev 116594e063 feat(docs): S1 — generated canonical-vocabulary appendix (STUMBLES #1)
3 months ago
dev 730812c074 fix(uix): clear the catalog's clean functional-error flags + reframe C10 tiers
3 months ago
dev bbd9c467e5 test(eidos): triage the 15 long-red suite failures — 289/289 green, check 61→59
3 months ago
dev 6001d9bb47 feat(eidos): C7 — size-bundle adoption swept across the recipe catalog
3 months ago
dev 0a80da8d2b docs+fix: old docs quarantined in docs/old-deprecated; STUMBLES doc-class fixes
3 months ago
dev 62815cb485 feat(eidos): C6 — universal palette cascade moves into the generator
3 months ago
dev bfcff0e3c0 fix(uix): C5 — every eventful morfo declares its sema expression mode
3 months ago
dev 85e2356d49 fix(uix): C4 — APG anchors for 29 interactive components (20 patterns + 5 documented absences)
3 months ago
dev 3b08711d77 fix(uix): C3 — literal typography swept across 16 recipes (R-2.7 clean)
3 months ago
dev e009bdf80f fix(uix): C2b — invalid/disabled/readonly states: real fixes + cited exceptions
3 months ago
dev 9975a67d53 fix(uix): C2a — R-1.5 recognizes the framework's own focus patterns; class resolved
3 months ago
dev abede885c7 fix(uix): C1 — zero BROKEN components; documented-exception valve in the audit
3 months ago
dev 73826b9f81 docs(process): component-coherence plan — audited weaknesses + C1-C10 batches
3 months ago
dev 106f751955 docs(book): plan closed — F7 complete, docs workstream finished
3 months ago
dev e65e39c41d docs(book): F7.7 — CLAUDE.md thinned; the docs-book plan (F7) is COMPLETE
3 months ago
dev 97fa5b6bad docs(book): F7.5 + F7.6 closed in plan + hand-off — only F7.7 (CLAUDE.md) remains
3 months ago
dev 6735c40187 docs(book): F7.4 closed — rfcs/ row in the TOC, plan + hand-off updated; next is F7.5 (guides/)
3 months ago
dev 732e128bf1 docs(book): F7.4 (4/4) — color-engine RFC translated; rfcs/ batch COMPLETE
3 months ago
dev 6b176e0801 docs(book): F7.3 closed in plan + hand-off — next batch is F7.4 (rfcs/)
3 months ago

Powered by TurnKey Linux.