Commit Graph

122 Commits (34d1d46bdb5ca8fc407dd47029fc474db9aea386)

Author SHA1 Message Date
dev 34d1d46bdb docs(theming): close THM-4 — 5 hotspots adjudicated, only 1 real debt item
3 months ago
dev 75fa94005b refactor(stepper): THM-4 — consolidate step state on data-state, drop boolean aliases
3 months ago
dev d9c3d03f7d docs(theming): THM-4 dossier — media-player + stepper adjudicated, low debt rate
3 months ago
dev 0a5aa387b9 docs(theming): close THM-2 rollout — Avatar.Badge out of the scale palette by design
3 months ago
dev cc7e9a162a feat(theming): THM-2 - avatar root palette to the shared layer + 33 scales
3 months ago
dev 05f0031cad feat(theming+soma): media-player Batch-4 (SOM-4) + THM-2 shared-palette rollout to 14 surfaces
3 months ago
dev c00164570a feat(text-gradient): `colors` discriminates canonical name vs stop list (folds `preset`)
3 months ago
dev 6da8466f68 docs(process): handoff — media-player Batch-4 scopeado como arranque de la próxima sesión
3 months ago
dev 0e75890f60 feat(theming): THM-2 — paleta universal por instancia (capa compartida + forward), 5/17 superficies
3 months ago
dev 63b371d5ce feat(packs+text): incorporate the animation collection — Ambient pack + text-effects family + docs
3 months ago
dev 082b66232a docs(process): SEM-4 COMPLETO — D.6 ya estaba vivo (registro reconciliado) + D.2 descartado
3 months ago
dev b55ca6eecb fix(cleanroom): F2+F3+F4-C+SEM-4s1 — lote mecánico, censos con guard, corpus documental y el close polimórfico de los pickers VIVO
3 months ago
dev 29e621b17c docs(process): handoff — F0+F1 EJECUTADAS; turnkey F2 (lote mecánico) + doctrina AUX-1
3 months ago
dev 4addfd7dbf fix(cleanroom): P1s ejecutados (EID-1/EID-2/SEM-1/MOR-4/THM-1/THM-3) + auditoría + plan scene/ambient
3 months ago
dev 4c1fbec1d8 docs(audit): formal programme close-out + the clean-room continuation handoff
3 months ago
dev 3fc450fccc docs(process): handoff - AUDIT PROGRAMME COMPLETE, full matrix green (134/0/0); next = clean-room P1s
3 months ago
dev 5f55c5dcc1 docs(process): handoff - R-1.x census closed (129 PASS); queue = final lote 6 only, then clean-room P1s
3 months ago
dev 850fd1e725 docs(process): handoff - runtime-discipline tail closed, contracts 37/37; queue = R-1.x census + lote 6
3 months ago
dev 82e9aba946 docs(process): handoff - demos out of the fix (new system demo frame); real queue = 16 in 3 families
3 months ago
dev 5fa5271586 docs(process): handoff - contracts census closed (12->3); deliberate tail = float-panel/media-player runtime discipline
3 months ago
dev cbd86c35a6 docs(process): handoff - S9 COMPLETE (all three initiatives closed); remaining = cross-catalog censuses only
3 months ago
dev fea4c14b09 docs(process): handoff - S9 ntp integral closed; remaining = metrics+suite + three cross-catalog censuses
3 months ago
dev f59f51a824 docs(process): handoff - S9 gradient-* closed; next ntp integral / metrics+suite + two cross-catalog censuses
3 months ago
dev bf573430b8 docs(theming): close the touch-rows/§37 reconciliation — pseudo hit-slop CONFIRMED (user decision)
3 months ago
dev 20e2e7a1f0 docs(components): S4 lotes 2-5 + drag-drop — 24 consumer-door dossiers, E-2.3 = 0 (P7)
3 months ago
dev 270cc3d764 docs(process): handoff - S4 lote 1 hash + turnkey start block for lote 2 (pickers/nav)
3 months ago
dev 7b82aa79f6 docs(components): S4 lote 1 (forms) — consumer-door dossiers + field-langs soma contract (P7)
3 months ago
dev cccdb89785 docs(process): handoff — P7 baseline+S7 done; S4 dossier plan (5 batches), S9 deferred post-S4
3 months ago
dev c0ae3de102 fix(soma): clear the two mandated baseline type errors (P7 — editable, grid-list)
3 months ago
dev 05a62a3861 docs(process): handoff — P6 closed (C6 weekInfo, C7 D13 census, B.11 splitter pair); next P7
3 months ago
dev 3c36c051c9 docs(process): refresh audit-fix handoff — S6 Field-family complete
3 months ago
dev 53b6f629f2 feat(audit): component re-audit + fixes P0–P5 (P4 complete, P5 in progress)
3 months ago
dev 40284a3d98 docs(process): arts-docs-reconciliation COMPLETE — A0..B3 closed
3 months ago
dev d326d035c7 docs(arts): B3 — point the runtime-artifact shortcut at the composition root
3 months ago
dev 34e0cb6107 docs(arts): B2 — move historical DESIGN docs to decisions/
3 months ago
dev e8ae85ee94 docs(arts): B1 — promote active-app to an architecture chapter
3 months ago
dev 275689874e docs(process): arts-docs-reconciliation continuation handoff
3 months ago
dev 89c88a990b Revert "feat(morfo): `cssVars` contract for soma→eidos functional vars (STUMBLES #7 closed, option A1)"
3 months ago
dev 36c7c4b26a feat(morfo): `cssVars` contract for soma→eidos functional vars (STUMBLES #7 closed, option A1)
3 months ago
dev 0ca2495468 docs(soma,stumbles): S6 authoring notes; STUMBLES #9 resolved (8/9 closed)
3 months ago
dev 528de2b271 docs(process): lock the arts-reconciliation structural decisions
3 months ago
dev 6941f1bf09 docs(process): mark Knob relocation + Gesture.rotate wiring done
3 months ago
dev daca836026 docs(process): arts docs reconciliation plan (the active-app ecosystem)
3 months ago
dev d4f9474f06 docs(process): mark STUMBLES S4 (Gesture.rotate) done; next = Knob wiring + S5/S6
3 months ago
dev b98e9fbfeb docs(process): mark STUMBLES S2 (continuous-components doctrine) done; next = S4
3 months ago
dev 1da36ca6fb docs(sema): add "Continuous components" doctrine section (STUMBLES S2)
3 months ago
dev 5508dfb4ee refactor(adom): own port of runed's DOM-reactive runes (F3) — port complete
3 months ago
dev 02d87b37f3 docs(process): mark STUMBLES S3 (part-absent) done; next = S2/S4
3 months ago
dev 1150404329 feat(morfo): add `part-absent` condition — inverse of `part-present` (STUMBLES S3)
3 months ago
dev d0f41fb21a refactor(libs): own port of runed + tabbable — drop 2 runtime deps (F1+F2)
3 months ago

Powered by TurnKey Linux.