68 Commits (4564e56a0b2fa93157d4f98bd0538dda9d89b2ec)

Author SHA1 Message Date
dev 4564e56a0b Handoff reorganised: the current state only, the history apart
1 day ago
dev c3be65645c Handoff: spec v0.14 approved in the three implementations
1 day ago
dev e490b7bc95 Spec v0.14 draft: the decisions for the author
1 day ago
dev 3c1934fad7 Completeness review of the protocol against v0.13
1 day ago
dev b037889158 Handoff: fuzzing of v0.13 clean
1 day ago
dev 26b718ea6c Handoff: datekeys-ts 0.2.0 released
1 day ago
dev eaf0105462 Handoff: ParseInfo hardened, the 1 MiB limit kept
1 day ago
dev b6f85d09dd Handoff: spec v0.13 approved and tagged
1 day ago
dev 4dfab0b066 Handoff: the note on the page, plain errors, and the two addresses of section 44.1
1 day ago
dev 6146e1ee84 Handoff: the draft v0.13 with NAT64, the locator and the signing in TypeScript
1 day ago
dev d909322cbc Spec v0.12 approved and tagged; the Flutter app archived for now
1 day ago
dev 7fa443a122 Handoff: the shared vectors of the key of words
1 day ago
dev 081ecb3250 Stages 6b and 7b of Dart done and integrated: the library is complete
1 day ago
dev df0b777155 Handoff for 7 October: stages 0 to 5 of Dart, 6a and 7a done; 6b and 7b next
2 days ago
dev 32ce5c0848 Stages 6 and 7 of Dart: 6a and 7a running in parallel, 6b and 7b next
2 days ago
dev d74a145124 Stage 5 of Dart complete: 5c reviewed; the handoff brought up to date
2 days ago
dev 5d5982557e Stage 5 of Dart: 5a reviewed and integrated over 5b, 5c running
2 days ago
dev 6f90ea416d Stage 4 of Dart complete; stage 5 split into 5a, 5b and 5c, running
2 days ago
dev 6d48ff8208 The generator commit of datekeys-go is pushed
2 days ago
dev 913bd4c1dc Stage 4 of Dart: parts 4a and 4b reviewed and integrated, 4c running
2 days ago
dev 08858e50ab Stage 4 of Dart: the tables for Dart, and its three parts
2 days ago
dev d19bd897f8 Stage 3 of Dart reviewed and integrated on v0.11; next is stage 4
2 days ago
dev 0ecba84ddb Stage 2 of Dart done and reviewed; stage 3 running in its own worktree
2 days ago
dev a60da38954 Handoff for the next session: where every repo is, and stage 2 of Dart to relaunch
2 days ago
dev affdd8d01a Handoff: the decisions of 5 October, and the approval of v0.12 left for later
2 days ago
dev 098b6feffe Handoff: TypeScript at the draft v0.12, pushed, and stages 0 and 1 of Dart
2 days ago
dev 65b5a6c357 Handoff: the close of the session of 5 October
2 days ago
dev 0c2f97eb1a Handoff: the close of the session of 2 October
6 days ago
dev c2bdfa4531 Handoff: the close of the session of 1 and 2 October
6 days ago
dev 1d737cf6bf Handoff: spec v0.11 approved and tagged, and the next steps
6 days ago
dev 4a144a9dcd Handoff: the signature plan done in Go, the review, and what is left
6 days ago
dev a7c510405f Handoff at the end of the session of 1 October: spec v0.11 draft and steps 1 to 4 of the signature
6 days ago
dev 032aa99a30 Signature plan and handoff: no list of authorities
6 days ago
dev ac5e21def1 Signature plan and handoff: the key of words v2 is done in Go and in the page
6 days ago
dev b346bfc938 Signature plan and handoff: the author's four decisions are in the draft
6 days ago
dev 349d5a35ef Signature plan and handoff: the spec v0.11 draft is written
6 days ago
dev d5735875b4 Fable and Astra's proposal on signatures and seals, and what the spec says about it
6 days ago
dev b008e677de Spec v0.11 plan: the .dkk says where the .dkc is, encrypted for the date
6 days ago
dev 870b6403c6 Spec v0.11 plan: a public note in the capsule and in the .dkk; content outside the capsule proposed
6 days ago
dev 2e3cecde08 Handoff for 2 October: format 3 in the page, the key of words, the signature area review
7 days ago
dev e5f68636e0 Word key: the portable key as a .dkk file or as six words
7 days ago
dev bf2187c690 Plan of format 3 in datekeys-ts: step 8 done
7 days ago
dev 0340f0f1c6 Plan of format 3 in datekeys-ts: step 7 done
7 days ago
dev 83fd9e1e2e Plan of format 3 in datekeys-ts: step 6 done
7 days ago
dev 7c5781fca5 Plan of format 3 in datekeys-ts: step 5 done
1 week ago
dev d08ffc0fd2 Plan of format 3 in datekeys-ts: step 4 done
1 week ago
dev ce2f6b6bff Plan of format 3 in datekeys-ts: steps 2 and 3 done
1 week ago
dev 05f8a96e7e Plan of format 3 in datekeys-ts, and its first steps in the handoff
1 week ago
dev 103b97e72e Handoff and plan: main of datekeys-go advanced to spec v0.10
1 week ago
dev 51cd4a8d52 Handoff and plan: branch v0.10 pushed and spec v0.10 tagged
1 week ago

Powered by TurnKey Linux.